
is almost ready, the groundworks have been completed. The Portacabin arrives at 8am in the morning, and hopefully will be in position by 10 am. I will take a pic tomorrow and try to upload it. I then need to organise the bridge to get into the studio....hmmmm
Here is a not-to-scale plan of our garden, with the proposed position of the studio. The Garden is 65 feet by 26 approximately for scale.
No comments:
Post a Comment